Hydro Construction

Hydro Construction

For a more than a half a century of existence GRANIT has built many hydro technical structures of all kinds in Macedonia

These include concrete dams, embankments for river control, irrigation system and water supply system.

The company is proud of continuous contribution into the building and development of the national electric power system.

granit

In all these projects, GRANIT was awarded as the main contractor

Concrete dam Sveta Petka not far from the capital enables production of additional 120 MWh that is enough to satisfy the capital household needs and some part of the capitals industry.

Knezevo earth-rock dam with its 1.7mil m3 of embankments will contribute additional 22.5mil m3 useful water accumulation to the hydro system Zletovica.

Gallery

GRANIT PRODUCTION

Our strategy is to be economically independent and self-sufficient for most of its basic resources. Therefore securing resources such as rock, concrete and asphalt is of outmost importance.

  • 9
    CONCRETE PLANTS
  • 7
    ASPHALT PLANTS
  • 7
    STONE QUARRIES
  • 11
    PRODUCTION FACILITIES