HYDRO CONSTRUCTION

Name of Contract Employer’s Contract Value of Work Estimated Completion Date
Construction of Motorway Blace Public Enterprise for State Roads of Republic of Macedonia 14.294.329 Euro August 2023

HYDRO CONSTRUCTION

For more than a half a century, GRANIT has built many hydro technical structures of all kinds in Macedonia: concrete dams, embankments for river control, irrigation systems and water supply systems. The company is proud of its continuous contribution in the building and development of the national electric power system. Some of the more notable projects are:  the Kozjak hydro power plant with capacity of 100 MWh, the double-arched concrete dam in Sveta Petka, not far from the Capital of Macedonia which has a generation capacity of an additional 27,66 MWh, enough to satisfy the capital`s residential electricity needs and part of the capital`s industrial requirements. The Knezevo earth-rock dam with its 1.7 mil/m3 of embankments contributes an additional 22.5 mil/ m3 useful water accumulation to the hydro system at Zletovica. GD Granit AD Skopje is also a producer of electricity by a co-founding and its 50% ownership share of “Small Hydro Power Plants” a private company  that owns 7 small hydro power plants that participate in the electricity supply of the Republic of Macedonia,.

 

 

–   RATEVSKA REKA DAM,

MACEDONIA, 1972 – 1972

 

–   HPP ST. PETKA – MATKA, SKOPJE,

MACEDONIA, 2006 – 2012

 

–   KNEZEVO DAM,

MACEDONIA, 2009

 

facebook
Twitter
Follow

CONTRACT ID

Contract name:
Construction of Motorway Blace

Brief Description of the Works performed:
Road construction works

Name of Employer:
Public Enterprise for State Roads of Republic of Macedonia

Gallery

GRANIT PRODUCTION

Our strategy is to be economically independent and self-sufficient for most of its basic resources. Therefore securing resources such as rock, concrete and asphalt is of outmost importance.

  • 9
    CONCRETE PLANTS
  • 7
    ASPHALT PLANTS
  • 7
    STONE QUARRIES
  • 11
    PRODUCTION FACILITIES