CONSTRUCTION OF HIGHWAY KICEVO – OHRID, SECTION KICEVO-PODVIS

Name of Contract Employer’s Contract Value of Work Estimated Completion Date
Construction Of Motorway Kicevo – Ohrid, Section Kicevo-Podvis Public Enterprise for State Roads of Republic of Macedonia 117.609.360,15 EUR 2018

CONSTRUCTION OF HIGHWAY KICEVO – OHRID, SECTION KICEVO-PODVIS

The Working Unit Kicevo – Ohrid is established by the decision of the Management Board of Granit in May 2014, in order to construct the Motorway Kicevo – Ohrid, section Kicevo – Podvis.

According to the Contract for construction of the Motorway:
– Granit Construction Stock Co. is nominated subcontractor;
– Sinohydro Corporation Limited is Main Contractor
– Consorcium GIM, Euroconsulting and Geing Krebs und Kiefer is Engineer;
– Public Enterprise for state roads is Employer.

The total price of the Contract for construction of the Motorway Kicevo – Ohrid, section Kicevo – Podvis is 117.609.360,15 euro.
Reinforced concrete works of the Motorway participate with more than 60% in the total price of the Contract for construction of the Motorway.

The time period for completion is 38 months from the commencement date.

Section Kicevo – Podvis consists of the following structures:
12 viaducts with prestressed beam girders, with total length of 3,60 km in both directions;
2 viaducts with balanced cantilevered method of construction, with total length of 1,80 km
2 overpasses
1 underpass with an interchange on the Motorway
Retaining walls with total length of 1,35 km

The critical points on the critical path of the Motorway Kicevo – Ohrid, section Kicevo – Podvis are the viaducts with balanced cantilevered method of construction, located at km 6+860 and km 9+105

facebook
Twitter
Follow

CONTRACT ID

Contract name:
Construction Of Motorway Kicevo – Ohrid, Section Kicevo-Podvis

Brief Description of the Works performed:
Road construction works

Name of Employer:
Public Enterprise for State Roads of Republic of Macedonia

Name of Main contractor:
Sinohydro Corporation Limited Beijing- Branch Office Skopje

Gallery

Project Map

GRANIT PRODUCTION

Our strategy is to be economically independent and self-sufficient for most of its basic resources. Therefore securing resources such as rock, concrete and asphalt is of outmost importance.

  • 9
    CONCRETE PLANTS
  • 7
    ASPHALT PLANTS
  • 7
    STONE QUARRIES
  • 11
    PRODUCTION FACILITIES