Design and construction of highway Banja Luka-Doboj section Banja Luka-Prnjavor

Name of Contract Employer’s Contract Value of Work Estimated Completion Date
Public Enterprise freeway Republika Srpska Street Vase Pelagic br10, 78000 Banja Luka 2017

Design and construction of highway Banja Luka-Doboj section Banja Luka-Prnjavor

Highway Banja Luka-Doboj is part of the north-south future pan-European Corridor V-c and is located in the Republic of Srpska.

The highway will have 4 new tracks (two double tracks) with a length of 35,3km (out of which 14,12km has been awarded to Granit AD Skopje)

From the west towards the east between Banja Luka and Prnjavor is the eastern section of the planned highway with a length of 71,91km which is connecting Banja Luka to the new Corridor V-c near Doboj. In one direction the average width is 10.7 meters which consists of two lanes that have 3.75 meters width and one lane for stopping and has striped markings.

The project will provide facilities for maintenance of the highway, centers of maintenance, sensors to monitor traffic, communcation equipment, signaling and patrol vehicles.

Within the project there are planned facilities for users such as resorts, petrol stations and car parks, as well as pay-tolls.

The highway is located between the river Vrbas and from a hydrographic aspect is densely intersected with smaller rivers like Gumjera, Crkvena reka, Lishnja, Ilova, Osinnja. The highway is crossing through the municipalities Laktashi and Prnjavor.

facebook
Twitter
Follow

CONTRACT ID

Contract name:
Construction of highway Banja Luka-Doboj section Banja Luka-Prnjavor

Brief Description of the Works performed:
Road construction works

Name of Employer:
Public Enterprise freeway Republika Srpska

Address:
Street Vase Pelagic br10, 78000 Banja Luka

Gallery

Project Map

GRANIT PRODUCTION

Our strategy is to be economically independent and self-sufficient for most of its basic resources. Therefore securing resources such as rock, concrete and asphalt is of outmost importance.

  • 9
    CONCRETE PLANTS
  • 7
    ASPHALT PLANTS
  • 7
    STONE QUARRIES
  • 11
    PRODUCTION FACILITIES